chore(deps): pin dependencies #1

Merged
schulze merged 1 commits from renovate/pin-dependencies into main 2024-08-18 21:02:29 +02:00
Collaborator

This PR contains the following updates:

Package Type Update Change
actions/checkout action pinDigest -> 692973e
actions/setup-node action pinDigest -> 1e60f62
sibiraj-s/action-eslint action pinDigest -> bcf41bb

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [actions/checkout](https://github.com/actions/checkout) | action | pinDigest | -> `692973e` | | [actions/setup-node](https://github.com/actions/setup-node) | action | pinDigest | -> `1e60f62` | | [sibiraj-s/action-eslint](https://github.com/sibiraj-s/action-eslint) | action | pinDigest | -> `bcf41bb` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 👻 **Immortal**: This PR will be recreated if closed unmerged. Get [config help](https://github.com/renovatebot/renovate/discussions) if that's undesired. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOC4zOS42IiwidXBkYXRlZEluVmVyIjoiMzguMzkuNiIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOltdfQ==-->
renovate-bot added 1 commit 2024-08-18 21:01:25 +02:00
chore(deps): pin dependencies
Some checks failed
Lint / Lint (push) Failing after 4s
Lint / Lint (pull_request) Failing after 4s
SonarQube Scan / SonarQube Trigger (pull_request) Successful in 17s
54ea8c5a3d
schulze merged commit 2c0f998cf6 into main 2024-08-18 21:02:29 +02:00
schulze deleted branch renovate/pin-dependencies 2024-08-18 21:02:30 +02:00
Sign in to join this conversation.
No reviewers
No Label
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: schulze/trackevery-day#1
No description provided.